A Real 2-Day Shower Renovation in Victoria BC
Stock renovation photos rarely show actual work happening. Here's a look at one of our real projects: our team hands-on during installation, and the finished wall panel shower once the work was done.

What goes into installing a wall panel shower
A wall panel renovation isn't a quick glue-and-go job. Each panel has to be custom-cut around plumbing, shower valves, and hardware, then set and sealed by hand so the finish is fully waterproof once it's done.

This is the part of a renovation most homeowners never see: careful measuring, cutting, and fitting so the panels, shelves, and grab bar line up cleanly before the glass enclosure ever goes on.
The finished result
Once the wall panels, fixtures, and glass are in, the result is a fully finished shower: rose marble-pattern wall panels, a frameless sliding glass door, floating glass shelves, and a grab bar built into the layout rather than added on as an afterthought.

That grab bar is worth calling out specifically. It shows a grab bar can be part of a high-end design instead of looking clinical or added on afterward, which is the same thinking behind our Accessibility Bathroom Solutions.
What's included in a 2-day wet area renovation
Complete removal of the old bath or shower
New waterproof acrylic wall panel system, available in multiple finishes
New shower or bath base
Moen shower valve
Glass shelving and hardware
Full scope and current pricing are on our 2-Day Wet Area Renovation page.
Why the 2-day timeline works
A 2-day wet area renovation is realistic when the shower or tub stays in its existing footprint, since that avoids new plumbing lines and, in most cases, a permit. Removal and rough-in happen on day one, and the wall panel system, fixtures, and glass enclosure go in on day two. If you're comparing this against a quote for a full layout change, the timelines won't match, and that's expected. For a breakdown of when a permit is or isn't needed, see our permits guide.
Frequently asked questions
Can a shower renovation really be finished in 2 days? Yes, when the shower or tub stays in its existing location. Removal and rough-in happen on day one, and the wall panel system, fixtures, and glass enclosure go in on day two.
What does a 2-day wet area renovation include? Complete removal of the old bath or shower, a new waterproof wall panel system, a new base, a Moen shower valve, and glass shelving. Starting price and full details are on our 2-Day Wet Area Renovation page.
Want a shower like this one?
Book a free consultation and we'll confirm your timeline and pricing before any work starts.
Call (250) 893-6066 or book a free consultation online.